Boost Your Productivity!Translate documents (Ms-Word, Ms-Excel, ...) faster and better thanks to artificial intelligence!
https://pro.wordscope.com
https://blog. wordscope .com
Authorise occupancy of rail tracks
Authorise occupancy of railroad lines
BTL technique
Below the line technique
Below-the-line method
Below-the-line technique
Check production line for deviations
Check quality of products on the production line
Checking quality of products on the production line
Connecting line
Connecting track
Issue rail track warrants
Issue railroad track warrants
Junction line
Loop line
Main line
Main track
Rail network
Railway line
Railway track
Running line
Running track
Test production line for deviations
Through line
Through track

Vertaling van "re-lining the track " (Engels → Nederlands) :

TERMINOLOGIE
main line | main track | through line | through track

doorgaand spoor | hoofdspoor


running line | running track | through line | through track

spoor voor normaal treinverkeer


connecting line | connecting track | junction line | loop line

verbindingsbaan | verbindingsspoor


rail network [ railway line | railway track ]

spoorwegnet [ spoorlijn | spoorweg ]


A very rare tumor of the intestine, originating from the epithelium of the anal canal (including the mucosal surface, anal glands, and lining of fistulous tracts), macroscopically appearing as a nodular, often ulcerated, invasive mass located in the

adenocarcinoom van anaal kanaal


A rare epithelial tumor of the rectum, arising from squamous cells in the rectal epithelium, without the presence of squamous-lined fistulous tracts in the rectum or a proximal extension of squamous cell carcinoma of anal or gynecological origin. The

plaveiselcelcarcinoom van rectum


A line extending from the intersection of the internasal and frontonasal sutures, in the midsagittal plane (nasion) and the junction of frontal bone and nasal bone (a point).

cefalometrische lijn van nasion naar A-punt


authorise occupancy of railroad lines | issue railroad track warrants | authorise occupancy of rail tracks | issue rail track warrants

bezetting van treinsporen goedkeuren


checking quality of products on the production line | test production line for deviations | check production line for deviations | check quality of products on the production line

kwaliteit van producten op een productielijn controleren


below the line technique | below-the-line method | below-the-line technique | BTL technique

below-the-linemethode | BLT-methode
IN-CONTEXT TRANSLATIONS
(1) nominal track gauge for new railway lines: 1 435 mm, except in cases where the new line is an extension on a network the track gauge of which is different and detached from the main lines in the Union;

(1) nominale spoorwijdte voor nieuwe spoorlijnen: 1 435 mm, behalve wanneer een nieuwe lijn een uitbreiding is van een netwerk waarvan de spoorwijdte afwijkt van en los staat van het hoofdspoornet in de Unie;


In order to avoid inhomogeneity and unevenness in the wheel tracks, cores should not be taken in wheel tracks themselves, but close to them.

Om een gebrek aan homogeniteit en eenvormigheid van de wielsporen te voorkomen, worden de boormonsters niet in de eigenlijke wielsporen genomen, maar in de nabijheid ervan.


nominal track gauge for new railway lines: 1 435 mm except in cases where the new line is an extension on a network the track gauge of which is different and detached from the main rail lines in the Union.

nominale spoorbreedte voor nieuwe spoorlijnen: 1 435 mm, behalve in het geval van een nieuwe lijn die een uitbreiding is van een netwerk waarvan de spoorbreedte afwijkt van en los staat van het hoofdspoornet in de Unie.


Plain line ballasted track conforming to the following characteristics is deemed to have met the requirements set out in § 4.2.13.1 related to track resistance to longitudinal, vertical and lateral forces:

In ballast gelegd hoofdspoor met de volgende karakteristieken wordt geacht aan de eisen van § 4.2.13.1 ten aanzien van de weerstand van spoor tegen zijdelingse, verticale en dwarskrachten te hebben voldaan:


For more results, go to https://pro.wordscope.com to translate your documents with Wordscope Pro!
the structure gauges, the distance between track centres, the track alignment, track gauge, maximum up and down gradients as well as the length and height of passenger platforms of the lines of the interoperable European network shall be set such as to ensure the lines' mutual compatibility and compatibility with the interoperable vehicles,

de profielen van vrije ruimte, de hart-op-hartafstanden van aangrenzende sporen, de spoorwijdte, de maximale hellingen alsmede de lengte en de hoogte van de reizigersperrons van de lijnen van het Europese interoperabele spoorwegnet moeten zodanig worden vastgesteld dat de compatibiliteit van de lijnen onderling en de interoperabiliteit van de voertuigen gewaarborgd is;


Stabling tracks are not required to comply with all the characteristics of the plain line track; however, stabling tracks are to comply with some specific requirements as set out in Chapter 4 to allow technical compatibility with trains complying with High-Speed Rolling Stock TSI.

Opstelspoor behoeft niet in alle opzichten te voldoen aan de karakteristieken van het hoofdspoor; wel moet het voldoen aan enkele specifieke eisen (hoofdstuk 4) om technisch compatibel te zijn met de TSI voor Hogesnelheidsmaterieel.


ensure that the areas accessible to passengers in the course of normal line operation are located away from the tracks carrying trains at high-speed, or are suitably segregated from those tracks, to minimise the risk to the passengers, and are provided with the necessary access ways to evacuate passengers, in underground stations in particular,

de zones toegankelijk voor reizigers tijdens de normale exploitatie van de spoorlijn zich op een zodanige afstand van door hogesnelheidstreinen bereden sporen bevinden dan wel daarvan gescheiden zijn dat de veiligheid van de reizigers gewaarborgd is en dat deze zones, in het bijzondere geval van ondergrondse stations, voorts voorzien zijn van voor reizigers toegankelijke nooduitgangen;


On behalf of the Commission and the Union, I have made it clear to Albania’s political leadership and to the general public of that country that a sustained track record of successful implementation of the Stabilisation and Association Agreement, as well as a tangible track record of reforms and their implementation on the ground, must be established over time before any consideration of further formal steps towards the European Union is possible. Implementation, implementation and implementation should be the name of the game in Albania now as regards its European aspirations.

Ik heb de politieke leiders en de bevolking van Albanië namens de Commissie en de EU duidelijk gemaakt dat eerst moet blijken dat Albanië er gedurende een langere periode in slaagt om de Stabilisatie- en associatieovereenkomst ten uitvoer te leggen en hervormingen door te voeren, voordat verdere formele stappen op weg naar de Europese Unie kunnen worden overwogen. Tenuitvoerlegging, tenuitvoerlegging en nog eens tenuitvoerlegging: daar komt het op aan als het gaat over de Europese aspiraties van Albanië.


for any project concerning the renewal or upgrading of an existing line where the loading gauge, track gauge, space between the tracks, or electrification voltage in these TSIs is not compatible with those of the existing line;

elk project met betrekking tot de vernieuwing of verbetering van een bestaande lijn, wanneer het profiel, de spoorbreedte, de spoorafstand of de elektrische voltage in deze TSI's niet verenigbaar is met die van de bestaande lijnen;


for a project to renew or upgrade an existing line where the loading gauge, track gauge, minimum track centre distance or electrical voltage laid down in these TSIs are incompatible with those of the existing line;

voor een project betreffende de vernieuwing of herinrichting van een bestaande lijn wanneer het profiel, de spoorbreedte of de asafstand tussen de sporen of de stroomspanning van die TSI's onverenigbaar zijn met die van de bestaande lijn;




datacenter (1): www.wordscope.nl (v4.0.br)

're-lining the track' ->

Date index: 2023-02-16
w