Boost Your Productivity!Translate documents (Ms-Word, Ms-Excel, ...) faster and better thanks to artificial intelligence!
https://pro.wordscope.com
https://blog. wordscope .com
ATFM
Air traffic flow management

Vertaling van "ATFM " (Engels → Nederlands) :

TERMINOLOGIE
air traffic flow management | ATFM [Abbr.]

luchtverkeersstroomregeling | regeling van luchtverkeersstromen | ATFM [Abbr.]
IN-CONTEXT TRANSLATIONS
data used and calculated by the central unit of ATFM as defined in Regulation (EU) No 255/2010 on ATFM such as flight plans for general air traffic under IFR rules, actual routing, surveillance data based on 30 seconds reporting interval, en route and airport ATFM delays, exemptions from ATFM measures, respect of ATFM slots, frequency of conditional route usage.

gegevens die worden gebruikt en berekend door de centrale ATFM-eenheid zoals gedefinieerd in Verordening (EU) nr. 255/2010 inzake ATFM, waaronder vliegplannen voor het algemene luchtverkeer onder IFR-regels, werkelijke routering, surveillancegegevens op basis van een rapporteringsinterval van 30 seconden, luchtverkeersbeveiligingsvertragingen en-route en op luchthavens, vrijstellingen van ATFM-maatregelen, naleving van ATFM-slots, frequentie van voorwaardelijk routegebruik.


the en route ATFM delay is the delay calculated by the central unit of ATFM as defined in Commission Regulation (EU) No 255/2010 laying down common rules on air traffic flow management and expressed as the difference between the estimated take-off time requested by the aircraft operator in the last submitted flight plan and the calculated take-off time allocated by the central unit of ATFM.

de en-route-ATFM-vertraging is de vertraging die wordt berekend door de centrale ATFM-eenheid zoals gedefinieerd in Verordening (EU) nr. 255/2010 van de Commissie tot vaststelling van gemeenschappelijke regels inzake de regeling van luchtverkeersstromen en wordt uitgedrukt als het verschil tussen de geraamde starttijd die is aangevraagd door de luchtvaartmaatschappij in het laatst ingediende vliegplan en de berekende starttijd die door de centrale ATFM-eenheid is toegewezen.


data used and calculated by the central unit of ATFM as defined in Regulation (EU) No 255/2010 on ATFM such as flight plans for general air traffic under IFR rules, actual routing, surveillance data based on 30 seconds reporting interval, en route and airport ATFM delays, exemptions from ATFM measures, respect of ATFM slots, frequency of conditional route usage;

gegevens die worden gebruikt en berekend door de centrale ATFM-eenheid zoals gedefinieerd in Verordening (EU) nr. 255/2010 inzake ATFM, waaronder vliegplannen voor het algemene luchtverkeer onder IFR-regels, werkelijke routering, surveillancegegevens op basis van een rapporteringsinterval van 30 seconden, luchtverkeersbeveiligingsvertragingen en-route en op luchthavens, vrijstellingen van ATFM-maatregelen, naleving van ATFM-slots, frequentie van voorwaardelijk routegebruik;


the en route ATFM delay is the delay calculated by the central unit of ATFM as defined in Commission Regulation (EU) No 255/2010 laying down common rules on air traffic flow management (1) and expressed as the difference between the estimated take-off time requested by the aircraft operator in the last submitted flight plan and the calculated take-off time allocated by the central unit of ATFM;

de en-route-ATFM-vertraging is de vertraging die wordt berekend door de centrale ATFM-eenheid zoals gedefinieerd in Verordening (EU) nr. 255/2010 van de Commissie tot vaststelling van gemeenschappelijke regels inzake de regeling van luchtverkeersstromen (1) en wordt uitgedrukt als het verschil tussen de geraamde starttijd die is aangevraagd door de luchtvaartmaatschappij in het laatst ingediende vliegplan en de berekende starttijd die door de centrale ATFM-eenheid is toegewezen;


For more results, go to https://pro.wordscope.com to translate your documents with Wordscope Pro!
local ATFM units and the central unit for ATFM shall be considered as part of the ATFM function.

lokale ATFM-eenheden en de centrale ATFM-eenheid worden als onderdelen van de ATFM-functie beschouwd.


local ATFM units and the central unit for ATFM shall be considered as part of the ATFM function.

lokale ATFM-eenheden en de centrale ATFM-eenheid worden als onderdelen van de ATFM-functie beschouwd.


the en route ATFM delay is the delay calculated by the central unit of ATFM as defined in Commission Regulation (EU) No 255/2010 of 25 March 2010 laying down common rules on air traffic flow management and expressed as the difference between the take-off time requested by the aircraft operator in the last submitted flight plan and the calculated take-off time allocated by the central unit of ATFM.

de en-route-ATFM-vertraging is de vertraging die wordt berekend door de centrale ATFM-eenheid zoals gedefinieerd in Verordening (EU) nr. 255/2010 van de Commissie van 25 maart 2010 tot vaststelling van gemeenschappelijke regels inzake de regeling van luchtverkeersstromen en wordt uitgedrukt als het verschil tussen de starttijd die is aangevraagd door de luchtvaartmaatschappij in het laatst ingediende vliegplan en de berekende door de centrale ATFM-eenheid toegewezen starttijd.


1. When an ATFM measure has to be applied, ATS units shall coordinate through the local ATFM unit with the central unit for ATFM in order to ensure that the choice of measure is made with respect to the optimisation of the overall performance effects on the EATMN.

1. Wanneer een ATFM-maatregel moet worden toegepast, zorgen de ATS-eenheden via de lokale ATFM-eenheid voor de coördinatie met de centrale ATFM-eenheid teneinde te garanderen dat bij de keuze van de maatregel wordt gestreefd naar het optimaliseren van het algehele effect op de prestaties van het EATMN.


the en route ATFM delay is the delay calculated by the central unit of ATFM as defined in Commission Regulation (EU) No 255/2010 of 25 March 2010 laying down common rules on air traffic flow management (1) and expressed as the difference between the take-off time requested by the aircraft operator in the last submitted flight plan and the calculated take-off time allocated by the central unit of ATFM;

de en-route-ATFM-vertraging is de vertraging die wordt berekend door de centrale ATFM-eenheid zoals gedefinieerd in Verordening (EU) nr. 255/2010 van de Commissie van 25 maart 2010 tot vaststelling van gemeenschappelijke regels inzake de regeling van luchtverkeersstromen (1) en wordt uitgedrukt als het verschil tussen de starttijd die is aangevraagd door de luchtvaartmaatschappij in het laatst ingediende vliegplan en de berekende door de centrale ATFM-eenheid toegewezen starttijd;


1. When an ATFM measure has to be applied, ATS units shall coordinate through the local ATFM unit with the central unit for ATFM in order to ensure that the choice of measure is made with respect to the optimisation of the overall performance effects on the EATMN.

1. Wanneer een ATFM-maatregel moet worden toegepast, zorgen de ATS-eenheden via de lokale ATFM-eenheid voor de coördinatie met de centrale ATFM-eenheid teneinde te garanderen dat bij de keuze van de maatregel wordt gestreefd naar het optimaliseren van het algehele effect op de prestaties van het EATMN.




Anderen hebben gezocht naar : air traffic flow management     ATFM     


datacenter (1): www.wordscope.nl (v4.0.br)

'ATFM' ->

Date index: 2023-11-01
w