Boost Your Productivity!Translate documents (Ms-Word, Ms-Excel, ...) faster and better thanks to artificial intelligence!
https://pro.wordscope.com
https://blog. wordscope .com
Coal-burning power station
Electric power plant
Fossil-fuel power plant operations
Fossil-fuel power station operations
Generation of geothermal power
Geo-thermal plant operator
Geothermal plant
Geothermal plant operator
Geothermal power generation
Geothermal power plant
Geothermal power plant operations
Geothermal power plant operative
Geothermal power plant operator
Geothermal power station
Hydro-electric power plant
Hydro-electric power station
Oil-burning power station
Operating fossil-fuel power plants
Operations in fossil-fuel power plants
Operations in geothermal power plant
Power plant
Power station
Thermal power station

Vertaling van "Geothermal power plant operative " (Engels → Nederlands) :

TERMINOLOGIE
geothermal plant operator | geothermal power plant operative | geo-thermal plant operator | geothermal power plant operator

operator energieproductie | exploitatietechnicus geothermische energiecentrale | operator geothermische energieproductie


geothermal power generation | operations in geothermal power plant | generation of geothermal power | geothermal power plant operations

exploitatie van een geothermische energiecentrale | exploitatie van een geothermische krachtcentrale | exploitatie van een aardwarmtecentrale | exploitatie van een geothermische centrale


geothermal plant | geothermal power plant | geothermal power station

geothermische centrale


fossil-fuel power station operations | operating fossil-fuel power plants | fossil-fuel power plant operations | operations in fossil-fuel power plants

exploitatie van energiecentrales op fossiele brandstoffen | exploitatie van met fossiele brandstoffen gestookte energiecentrales


Advisory Committee on Programme Management for Technical Assistance to Nuclear Power Plant Operators

Raadgevend comité inzake programmabeheer Technische assistentie aan kerncentrale-exploitanten


power plant [ coal-burning power station | electric power plant | geothermal power station | hydro-electric power plant | hydro-electric power station | oil-burning power station | power station | thermal power station ]

energiecentrale [ centrale | elektrische centrale | geothermische centrale | steenkoolcentrale | stuwdamcentrale | waterkrachtcentrale ]
IN-CONTEXT TRANSLATIONS
In phase one the nuclear power plant operators carried out a self-assessment, in phase two national regulators evaluated these self-assessments and prepared country reports.

In de eerste fase voerden de exploitanten van de kerncentrales een zelfbeoordeling uit. In de tweede fase evalueerden de nationale regelgevende instanties deze zelfbeoordelingen en stelden ze verslagen per land op.


Pre-assessment by the nuclear power plant operators which answer the stress tests questionnaire, submitting supporting documents, studies and plans.

een voorafgaande beoordeling door de exploitanten van de kerncentrales aan de hand van de stresstestvragenlijst, bewijsstukken, studies en plannen;


National Report drawn up by the national regulator checking whether answers of nuclear power plant operators are credible.

een nationaal verslag van de nationale regulator die de geloofwaardigheid van de antwoorden van de exploitanten van de kerncentrales is nagegaan;


It did not cover the overall situation of the nuclear sector, but analysed the EU situation for a critical group, namely the availability of nuclear safety relevant personnel with Nuclear Power Plant operators and regulatory bodies .

In deze studie werd niet het geheel van de situatie in de nucleaire sector bekeken, maar werd uitsluitend een analyse gemaakt van de situatie in de EU voor een kritische groep, namelijk de beschikbaarheid van personeel dat op de hoogte is van alle aspecten van nucleaire veiligheid bij de exploitanten van kerncentrales en binnen de regelgevingsinstanties .


For more results, go to https://pro.wordscope.com to translate your documents with Wordscope Pro!
The holder of the drawing rights can decide on the level of use of the reserved capacities and pays to the power plant operator a price corresponding to the variable costs incurred for the energy generated from the reserved capacities.

De houder van de trekkingsrechten kan beslissen over de mate van gebruik van de gereserveerde capaciteit en betaalt een prijs aan de exploitant van de energiecentrale die overeenkomt met de variabele kosten die ontstaan voor de energie die wordt opgewekt met de gereserveerde capaciteit.


The regulatory clearance is conditional on the divestment of International Power's shareholding in T-Power, the owner of a Belgian power plant due to start production in 2011, and the transfer to third parties of the operation and maintenance agreement of the T-Power plant.

Aan deze toestemming is zijn twee voorwaarden verbonden: International Power moet zijn belang in T-Power, de eigenaar van een Belgische elektriciteitscentrale die in 2011 in bedrijf moet komen, afstoten en de exploitatie- en onderhoudsovereenkomst voor de centrale van T-Power moet aan derden worden overgedragen.


The construction and operation of that nuclear power plant were authorised by the Czech authorities in 1985 and it has been operating at full capacity since 2003.

De Tsjechische autoriteiten hebben in 1985 een vergunning voor de bouw en de exploitatie van deze kerncentrale afgegeven en deze centrale werkt sinds 2003 op volle kracht.


As a result of the preliminary analysis, outlined in recitals 180 to 190, the Commission concluded that in order to establish whether an advantage existed, it should be ascertained whether under the conditions prevailing when Hungary joined the European Union, a market operator would have granted the generators a similar guarantee as that enshrined in the PPAs, namely a purchase obligation on the part of MVM of the capacities reserved in the PPAs (corresponding to a substantial proportion and, in many cases, to all the power plant's a ...[+++]vailable capacities), a guaranteed minimum quantity of generated power over a period of 15 to 27 years corresponding to the typical expected lifetime of the assets concerned or their depreciation, at a price covering the plant's fixed and variable costs (including fuel costs) (53).

Als gevolg van de in overwegingen 180 tot 190 beschreven voorlopige analyse kwam de Commissie tot de conclusie dat, om te bepalen of er een voordeel bestond, moest worden vastgesteld of onder de omstandigheden die van kracht waren toen Hongarije toetrad tot de Europese Unie een marktexploitant aan de producenten een soortgelijke garantie zou hebben gegeven als de garantie die vervat is in de PPA’s, namelijk een afnameverplichting voor MVM van de capaciteit die gereserveerd is in de PPA’s (hetgeen overeenkomt met een substantieel deel van en, in veel gevallen, de volledige beschikbare capaciteit van de energiecentrale), een gegarandeerde ...[+++]


In the case under assessment, the beneficiaries of the aid are the Hungarian companies that operate the power plants and signed the PPAs, and not the shareholders of the power plants.

In het onderhavige geval zijn de begunstigden van de steun de Hongaarse bedrijven die de energiecentrales exploiteren en de PPA’s hebben ondertekend en niet de aandeelhouders van die centrales.


Modernisation of the fleet of coal-fired power plants operating in the EU represents another early step towards Sustainable Fossil Fuels in Europe.

Een andere belangrijke stap naar het duurzaam gebruik van fossiele brandstoffen in de EU is de modernisering van het bestaande park van kolengestookte centrales.


w