Boost Your Productivity!Translate documents (Ms-Word, Ms-Excel, ...) faster and better thanks to artificial intelligence!
https://pro.wordscope.com
https://blog. wordscope .com
Calculate tunnel boring machine speed
Changing tunnel boring machine mode
Determine tunnel boring machine speed
Determining tunnel boring machine speed
Drive tunnel boring machine
Driving of tunnel boring machine
Driving tunnel boring machine
Mole
Monitor tunnel boring machine mode switch
Switch tunnel boring machine modes
T.b.m speed determination
TBM
Tunnel boring machine
Tunnel boring machine mode switching
Tunnel boring machine steering
Tunnel-boring machine
Tunnelling machine

Vertaling van "calculate tunnel boring machine speed " (Engels → Nederlands) :

TERMINOLOGIE
determining tunnel boring machine speed | t.b.m speed determination | calculate tunnel boring machine speed | determine tunnel boring machine speed

toerental tunnelboormachine bepalen | toerental tunnelboormachine instellen | snelheid tunnelboormachine bepalen | snelheid tunnelboormachine instellen


driving tunnel boring machine | tunnel boring machine steering | drive tunnel boring machine | driving of tunnel boring machine

tunnelboormachine besturen


changing tunnel boring machine mode | tunnel boring machine mode switching | monitor tunnel boring machine mode switch | switch tunnel boring machine modes

modus van tunnelboormachine veranderen | modus van tunnelboormachine wijzigen


mole | tunnel-boring machine | tunnelling machine | TBM [Abbr.]

tunnelgraafmachine


mole | tunnel boring machine | TBM [Abbr.]

machine voor het boren van tunnels
IN-CONTEXT TRANSLATIONS
Assessment of maximum pressure variation in the tunnel (10 kPa criterion) is to be made using the results of calculations made by the Infrastructure Manager or the contracting entity on the basis of all operational conditions with all the trains complying with the High Speed Rolling Stock TSI and intended to run in the specific tunnel to be assessed.

De keuring van de maximale drukvariaties in een tunnel (10 kPa-criterium) moet plaatsvinden aan de hand van de door de infrastructuurbeheerder of de aanbestedende dienst op basis van alle bedrijfscondities gemaakte berekeningen voor treinen die voldoen aan de eisen van de TSI voor hogesnelheidsmaterieel en die bedoeld zijn voor inzet in de te keuren tunnel.


Assessment of maximum pressure variation in the tunnel (10 kPa criterion) is to be made using the results of calculations made by the Infrastructure Manager or the contracting entity on the basis of all operational conditions with all the trains complying with the High Speed Rolling Stock TSI and intended to run in the specific tunnel to be assessed.

De keuring van de maximale drukvariaties in een tunnel (10 kPa-criterium) moet plaatsvinden aan de hand van de door de infrastructuurbeheerder of de aanbestedende dienst op basis van alle bedrijfscondities gemaakte berekeningen voor treinen die voldoen aan de eisen van de TSI voor hogesnelheidsmaterieel en die bedoeld zijn voor inzet in de te keuren tunnel.


w