Boost Your Productivity!Translate documents (Ms-Word, Ms-Excel, ...) faster and better thanks to artificial intelligence!
https://pro.wordscope.com
https://blog. wordscope .com
Assess functionality of ground systems
Develop tests for ground system performance
Develop tests for performance of ground systems
Perform routine lube oil testing
Perform routine lube oil tests
Perform routine lubrication oil tests
Perform testing on AIM systems
Test AIM systems for improvement
Test ground system performance
Test lubrication in engineering systems

Vertaling van "test ground system performance " (Engels → Nederlands) :

TERMINOLOGIE
develop tests for ground system performance | develop tests for performance of ground systems | assess functionality of ground systems | test ground system performance

prestaties van grondsystemen testen


perform testing on AIM systems | perform testing on improved aeronautical information management systems | test AIM systems for improvement | test improved aeronautical information management systems

verbeterde aeronautische informatiebeheersystemen testen


perform routine lube oil testing | perform routine lubrication oil tests | perform routine lube oil tests | test lubrication in engineering systems

routinetesten van smeerolie uitvoeren
IN-CONTEXT TRANSLATIONS
26.2. Air-conditioning system tested in accordance with section 9 of ISO 14269-2:1997 (Tractors and self-propelled machines for agriculture and forestry — Operator enclosure environment — Part 2: Heating, ventilation and air-conditioning test method and performance) and test reports are included in the information document: yes/no/not applicable (4)

26.2. Het klimaatregelingssysteem is getest in overeenstemming met punt 9 van ISO 14269-2:1997 (Tractors and self-propelled machines for agriculture and forestry -- Operator enclosure environment -- Part 2: Heating, ventilation and air-conditioning test method and performance) en de testrapporten zijn vermeld in het inlichtingenformulier: ja/neen/niet van toepassing (4)


26.1. Heating system tested in accordance with section 8 of ISO 14269-2:1997 (Tractors and self-propelled machines for agriculture and forestry — Operator enclosure environment — Part 2: Heating, ventilation and air-conditioning test method and performance) and test reports are included in the information document: yes/no/not applicable (4)

26.1. Het verwarmingssysteem is getest in overeenstemming met punt 8 van ISO 14269-2:1997 (Tractors and self-propelled machines for agriculture and forestry -- Operator enclosure environment -- Part 2: Heating, ventilation and air-conditioning test method and performance) en de testrapporten zijn vermeld in het inlichtingenformulier: ja/neen/niet van toepassing (4)


However, if the tests above were performed at a higher speed and/or the acceleration curve has exceeded the upper level of the hatched area and the Child Restraint System meets the requirements, the test shall be considered satisfactory.

Als bovengenoemde tests met een hogere snelheid zijn uitgevoerd en/of als de versnellingscurve het bovenste niveau van het gearceerde gebied heeft overschreden en het kinderbeveiligingssysteem aan de voorschriften voldoet, wordt de test evenwel als geslaagd beschouwd.


If the tests above were performed at a higher speed and/or the deceleration curve has exceeded the upper level of the hatched area and the Child Restraint System meets the requirements, the test shall be considered satisfactory.

als bovengenoemde tests met een hogere snelheid zijn uitgevoerd en/of als de vertragingscurve het bovenste niveau van het gearceerde gebied heeft overschreden en het kinderbeveiligingssysteem aan de voorschriften voldoet, wordt de test als geslaagd beschouwd.


For more results, go to https://pro.wordscope.com to translate your documents with Wordscope Pro!
It organises the deployment of the SESAR concept in 3 progressive steps: Step 1 – aiming to provide the necessary technologies to synchronise the European ATM system through an efficient exchange of information amongst all the actors; Step 2 – will achieve more efficient planning of flight trajectories; and Step 3 – aims to achieve the highest level of performance through an integrated and seamless air/ ...[+++]

Volgens het masterplan wordt het SESAR-concept in drie achtereenvolgende stappen uitgerold: stap 1 — voorzien in de noodzakelijke technologie voor het synchroniseren van het Europees ATM-systeem door een doeltreffende uitwisseling van informatie tussen alle actoren; stap 2 — een efficiëntere planning van de vluchtbanen; stap 3 — het behalen van het hoogste prestatieniveau door een geïntegreerd en naadloos lucht-/grondsysteem.


To assure that the high quality of testing is kept over time Member States are required to set up a quality assurance system that covers the processes of authorisation, supervision and withdrawal, suspension or cancellation of the authorisation to perform roadworthiness tests.

Om de degelijkheid van de controles te allen tijde te waarborgen dienen de lidstaten een kwaliteitsborgingssysteem op te zetten voor de verlening van, het toezicht op en de intrekking, schorsing of annulering van een vergunning om technische controles uit te voeren.


If appropriate the tests shall be performed without and with mammalian metabolic activation and the compatibility of the test material with the test system shall be taken into account.

Zo nodig moeten de tests zonder en met metabole activering in een zoogdiersysteem worden uitgevoerd en moet rekening worden gehouden met de compatibiliteit van het testmateriaal met het testsysteem.


ICAROS-NET uses four areas as test-grounds to validate the system.

ICAROS-NET gebruikt vier testgebieden voor het valideren van het systeem.


Annex 1: List of selected projects Annex 2: Examples of CRAFT projects Annex 1 INDUSTRIAL AND MATERIALS TECHNOLOGIES Brite-EuRam II 1990-1994 List of 23 CRAFT projects retained Nr of the proposal Title of the proposal, prime proposer and country CR-1197-91 The recycling of second-hand textile waste Prime proposer : TRICOOP SC (B) CR-1280-91 Automatic reuse of electronic components on printed circuit boards and separation of toxic components Prime proposer : Weld-Equip D.V (NL) CR-1283-91 Plasma coupling of microwave supplies in reactors for treatment of polymers and organic materials Prime proposer : Plassys (F) CR-1292-91 Non destructive testing and imaging of c ...[+++]

Bijlage 1: Lijst van geselecteerde projecten Bijlage 2: Voorbeelden van CRAFT-projecten Annex 1 INDUSTRIAL AND MATERIALS TECHNOLOGIES Brite-EuRam II 1990-1994 List of 23 CRAFT projects retained Nr of the proposal Title of the proposal, prime proposer and country CR-1197-91 The recycling of second-hand textile waste Prime proposer : TRICOOP SC (B) CR-1280-91 Automatic reuse of electronic components on printed circuit boards and separation of toxic components Prime proposer : Weld-Equip D.V (NL) CR-1283-91 Plasma coupling of microwave supplies in reactors for treatment of polymers and organic materials Prime proposer : Plassys (F) CR-1292-91 Non destructive testing and im ...[+++]


The latter cover such areas as the test procedure, the determination of performance criteria, the arrangement and installation of dummies and adjustment of restraint systems, and the definition of the deformable barrier which will be used in frontal- impact crash tests.

Deze laatste betreffen de beproevingsprocedure, de vaststelling van de prestatiecriteria, de opstelling en de installatie van de proefpoppen en de instelling van de bevestigingssystemen, en de definitie van het vervormbare blok dat in frontale-botsproeven wordt gebruikt.




datacenter (1): www.wordscope.nl (v4.0.br)

'test ground system performance' ->

Date index: 2022-08-26
w